INSTALLATION OF THE SOLAR SYSTEM
Location: Dong Van II Industrial Zone, Ha Nam Province
Starting date: 2022
Hand-over date:January, 2023
Total capacity: 4 MGW
Customer’s expectations:
- Rooftop solar power system connected to the grid with a total installation area of about 40.000 m2
- Power conversion inverter system
- Zero Export traction system
- The entire system is tested and approved for fire protection according to regulations.



